| Posted Date | 2012-10-19 02:55:50 |
| Modified Date | 2012-10-19 02:55:50 |
| Vessel Type | Reefer |
| Price | USD 3.0 MILLION |
| Nationality | Liberia |
| Class Society | NK |
| Year Built | 1993 |
| Capacity |
|
| Dimension |
| Length: | 126.0 |
| width: | 19.0 |
| Dipth: | |
| Draft: | |
|
| Main Engine |
| Engine Name: | MITSUB. 9600HP |
| HP: |
9600 PS |
|
Description:
| NO. |
REF466 |
| TYPE |
REEFER |
| FLAG |
LIBERIA |
| REGISTRY |
MONROVIA, LIBERIA |
| BUILT YEAR |
1993-02 |
| BUILT PLACE |
KITANIHON ZOSEN, JAPAN |
| CLASS |
NK |
| SS |
2012-12 |
| DD |
2012-12 |
| LOA |
126.0 M |
| LBP |
|
| BEAM |
19.0 M |
| DEPTH |
10.3 M |
| DRAFT |
7.76 M (SUMMER) |
| GT |
GRT: 6082 MT;PGRT: 6953 MT;SGRT: 6657.46 MT |
| NT |
NRT: 4061 MT;PNRT: 5548 MT;SNRT: 5570.76 MT |
| DWT |
7197 MT (SUMMER) |
| FLOOR SPACE CAPACITY |
|
| GEAR |
DERRICKS 8×5 T, UP 3.5 T |
| ME |
MITSUB. 9600HP |
| AE/GENERATOR |
|
| SPEED/CONSUMPTION |
BALLAST: 18 KTS ON ABT. 24MT+1.3MT IFO380CST;BANANA LADEN: 17.5 KTS ON ABT. 23 MT+2.5MT IFO380CST;FULLY LADEN: 17.0 KTS ON ABT. 24.7 MT+2.6MT IFO380CST;PORT CONSUMPTION: IDLE: 2.5 MT IFO380CST;WORKING: 3.0-4.0 MT IFO380CST;MINOR MDO CONSUMPTION WHEN STAND-BY AND MANEUVERING DURING ARRIVAL/DEPARTURE PORTS EXCEPT IN HEAVY WEATHER CONDITIONS;SPEED AND CONSUMPTION GIVEN MAX BEAUFORT 4 WIND/SEA CONDITIONS |
| FUEL TYPE |
|
| HOLD NUMBER |
4 |
| HATCH NUMBER |
4 |
| HATCH SIZE |
|
| COMPARTMENT |
12 |
| DECKS |
3 |
| DECK AREA |
3900 SQM |
| DECK HEIGHT |
MIN: 2.2 M |
| CAPACITY (CBFT) |
347082 |
| CAPACITY (CBM) |
9828 |
| BUNKER |
IFO380CST: 981 MT (1032.85 CBM), 100%;MDO: 162 MT (188.18 CBM), 100% |
| TYPE OF THE VENT SYSTEM |
|
| VENT |
VERT |
| TEMPERATURE |
-30/+15DC |
| AIR CHANGE |
90/HR |
| AIR CIRCS/VENTILATION |
90/60 |
| COOLING SECTIONS |
8 |
| CONTAINER |
12TEU |
| PALLET |
3000 |
| REEFER PLUG |
220 AC |
| INSPECTION PLACE |
|
| DELIVERY PLACE |
PERU |
| PRICE |
USD 3.0 MILLION |
| REMARKS |
P&I: NORTH OF ENGLAND;GRATING STRENGTH: 5 MT;USDA CERTIFICATE: 2012-01-01;VESSEL IS FITTED WITH COLLAPSIBLE SIDE SHORING;DELIVERY CAN BE MADE DURING OCTOBER TO NOVEMBER 2012. |
|
|